Cannisters Refurbishment & Recertification

Refurbishment

Older Cannisters will often become heavily scratched and marked, refurbishments will remove the majority of blemishes improving asthetic qualities. We also redress damaged VCR sealing beads, provide a leak test and a visual examination of the internal and external body welds.

Recertification

iCAM are an approved DOT RIN testing facility, for the re-certification of Bubblers to DOT 4B

Conditioning

  • Advanced RGA Vac and purge system
  • Helium leak test all welds and joints to 1×10-9 atm – cc/sec
  • Taken through a Vac and Nitrogen purge circle
  • Control software in place
  • Containers not released until RGA results <50ppbv

Repair & Refurbishment

 

Older Cannisters will often become heavily scratched and marked, refurbishments will remove the majority of blemishes improving aesthetic qualities. We also redress damaged VCR sealing beads, provide a leak test and a visual examination of the internal and Advanced RGA Vac and purge system

  • Helium leak test all welds and joints to 1×10-9 atm –. cc/sec
  • Taken through a Vac and Nitrogen purge circle
  • Control software in place
  • Containers not released until RGA results
  • Refurbished to meet all any specifications

Damaged VCR Valves no longer holding Vacuum? Rather than writing it off, we can replace the part and make it good as new again.

Recertification

iCAM are an approved DOT RIN testing facility, for the re-certification of Bubblers to DOT 4B

  • In process inspection system
  • Backed up by a 100% final visual & dimensional inspection
  • Proof pressure and expansion testing to DOT 4B
  • All results readily available if required
  • Utilising CMM inspection equipment
  • Used to support the SPC system in place.

We Provide RIN Testing

Conditioning

We offer a complete range of  Conditioning  Services

• Advanced RGA Vac and purge system
• Helium leak test all welds and joints to 1×10-9 atm – cc/sec
• Taken through a Vac and Nitrogen purge circle
• Control software in place
• Containers not released until RGA results